SBEM & Non-Domestic EPC
Project Type: SBEM & Non-Domestic EPC
Project Name: Southway Housing, New Head Offices
Location: Princess Road, Manchester
Turnaround: 1 Year Project
Date: 2018
Greater Manchester EPC have over 10 years combined experience in non-domestic SBEM calculations. We have performed SBEM calculations on various types and sizes of projects throughout Manchester and the UK ranging from simple retails units to new office developments, shopping centres and whole industrial sites.
Our energy assessors use SBEM (Simplified Building Energy Model) is a piece of software used to demonstrate compliance with Part L2 of Building Regulations. SBEM calculates the monthly energy usage and carbon dioxide emissions of a building based on the building geometry, construction, HVAC (eg. Heating, Cooling, Ventilation, Hot Water) and lighting.
SBEM calculations are required for all newly built non-domestic buildings with a heated or cooled environment and an internal floor area greater than 50m². Also, SBEM calculations are sometimes needed for commercial extensions, conversion and renovation projects.
Design Stage – Building Control require a Design Stage SBEM Calculation to be submitted with your building regulations application to ensure compliance of Part L2 of the Building Regulations. Building Control will not allow you to start construction of your project until the SBEM calculation is produced.
As-built Stage – Building Control require an As-built Stage SBEM Calculation and EPC (Energy Performance Certificate) when the building is completed. Without this paperwork it is unlikely that the building will achieve final Building Control approval.
Our SBEM Calculation process:
Email us your project plans info@greatermanchesterepc.co.uk or call on 07875 753571.
If you prefer, use our quick and simple contact us form.
We understand the building compliance process can be confusing. To discuss and advise on your project requirements call us on 07875 753571.
Project Type: SBEM & Non-Domestic EPC
Project Name: Southway Housing, New Head Offices
Location: Princess Road, Manchester
Turnaround: 1 Year Project
Date: 2018