Non-Domestic EPC

Project Type: Non-Domestic EPC

Location: Carrington Football Training Ground

Services: Non-Domestic EPC

Turnaround: 72 hours

Date: August 2018

Job Description: Greater Manchester EPC were instructed by JLL to undertake a level 4 non-domestic energy assessment on Carrington Football Training Ground, the former Manchester City FC Training Ground. Pete Bradshaw, the director of Estate Development Man City FC required the certificate for the transaction of new occupiers Bury FC.

Greater Manchester EPC’s Non-Domestic EPC Energy Assessor was required to survey the 23,000 sq. ft facility which comprised of a mixture zoning by activity; from office spaces, consultation & treatment areas, to a large gym and swimming pools for payer fitness and rehabilitation. We surveyed the property within a day, which included investigation into the various construction types and insulated elements of the building including floors, walls, ceiling and a variety of roof types. Our EPC assessor also had to investigate multiple Gas Heating & Hot Water System (HVAC Systems) which proved a challenge when determining which sections of the building they supplied heat and hot water.

Once our Commercial EPC assessor has collected all site and technical data, he was able to model the project in office which took approximately 3-4 working days. Our client was very satisfied with our professionalism and the turnaround time we produced on the project.

Reduce your risk, save time and money. Get in touch to see how we can make your project easier.

Get in touch

Why not discuss your project with a member of our team? Call us today on 07875 753 571